Life Safety Upgrades to Buildings 2113 and 785
U.S. Military Academy, West Point, NY

PAST PERFORMANCE & REFERENCE SHEET


Project Name & Location: Life Safety Upgrades to Buildings 2113 and 785, U.S. Military Academy, NY
Client Name & Address: Department of the Army, NY District, Corps of Engineers,
Jacob Javits Federal Building, 26 Federal Plaza, New York, NY 10278
Contract Number: DACA51-01-C-0042 Contract Duration: 270 Days
Date of Contract: 9/30/2001 Date work was started: 10/25/2001
Initial Completion Date: 7/22/2002 Revised Completion Date: 10/31/2002
   
Description of Contract Work:
Life Safety Upgrades to Buildings 2113 and 785 (Five Star Lodging facilities) at U.S. Military Academy, West Point, NY, inclusive of:

- Demolition
- Water Distribution System
- Firestopping
- Doors, Frames & Hardware
- Ceramic tile work
- Painting
- Canopy system (Design & Build)
- Fire Detection & Alarm System � Addressable
- Fire Protection System � Wet and Dry Pipe
- Plumbing

- Excavation, Trenching & Concreting
- Hand Railings and Guard Rails
- Finish carpentry & cabinets
- Gypsum wall partitions
- Acoustical ceilings
- Toilet accessories
- Elevator upgrade
- Fire Reporting System � Radio
- Seismic Protection
- Electrical Work


Finished hallway & ceiling


Finished lobby with new railing per code


Hallway during renovation

Life Safety Upgrades to Buildings 2113 and 785 works to include providing all required civil, architectural, specialties, fire protection sprinkler system, electrical and fire detection & alarm system and plumbing works to renovate and upgrade two Five Star Lodging Facilities with total of 96 rooms. Also included is upgrading elevator fire recall system in Building 2113, and a Design & Build Canopy System for Building 785. The project will provide advanced life safety measures to hotel patrons to meet the current life safety building codes.

All works have been accomplished within occupied hotel buildings while the hotel guests and maintenance personnel were facilitating the buildings. Works have been limited to six rooms at a time while other rooms were occupied, meaning all works had to be scheduled and completed once the rooms were vacant without re-entry. Collette Contracting Incorporated has performed the construction operations simultaneously in both buildings in a very professional �white glove� manner without disturbing the hotel guests and without a single complaint. Collette has paid special attention to dust and noise protection and such operations have been performed by close coordination with hotel management while the guests were out of the building, and working at times and days convenient to guests. In spite of various revisions and additions, the project has completed 45 days before the scheduled date. There was no accident or loss time since the project commencement. Collette Contracting�s performance has surpassed all contract requirements and exceeded many to the government�s benefit.


Handicap Ramp with D&B Canopy


Fire alarm Panel (during installation)


Fire Protection (sprinkler) underground pipe installation


Restored site after under ground pipe installation

Home  Introduction  Government Sector   Private Sector  Government Rating  Testimonials  News Articles  Contact Us


COLLETTE CONTRACTING
PO Box 363
Pequannock, NJ 07440
Phone: 201-832-1014
Fax: 973-633-5016
E-mail: gcollette@collettecontracting.com

Copyright � 2003 Network Development Corp. All Rights Reserved.